Under the Smart Export Guarantee, larger energy suppliers must pay you for electricity your solar panels send to the grid. You need an MCS certified system and a meter that records exports. Rates vary from about 1p to 25p a unit, so the tariff you choose matters.
Plug-in solar kits, legal since 27 August 2026, aren't installed under MCS, so they generally won't qualify for export payments.
| Tariff | Rate per unit | Catch |
|---|---|---|
| Octopus Outgoing | 12p, variable | Octopus electricity customers only (checked 11 October 2026) |
| Octopus Prime Outgoing | 16p from 4pm to 7pm, 9p other times | Fixed for 12 months (checked 11 October 2026) |
| British Gas Export and Earn Plus | 15.1p | British Gas customers (April 2026) |
| EDF Export 12m | 15p | EDF customers (April 2026) |
| E.ON Next Export Exclusive | 13p | E.ON Next customers, systems up to 15 kW (April 2026) |
| Good Energy Solar Savings | 15p | April 2026 |
| Tariffs tied to buying your system from the supplier | 15p to 25p | Only if they installed it (April 2026) |
| Basic tariffs open to anyone | about 1p to 6p | Octopus's is 4.1p (checked 11 October 2026) |
Rates change often. April 2026 figures are from Which?; check the supplier's current rate before switching.
If your battery only stores solar, exporting from it is fine. If it also charges from the grid, the supplier doesn't have to pay for electricity exported from it, because that power came from the grid, though some suppliers choose to. Ask your supplier how its tariff treats batteries.
Some tariffs pay more at peak times, such as Octopus's 4pm to 7pm rate. A battery can hold solar back to export at the higher rate, so the right tariff and the right battery settings go together.
Anywhere from about 1p to 25p a unit in 2026. Most suppliers' better tariffs for their own customers pay around 12p to 15p.
No. You can choose any supplier's export tariff, but the best rates are usually for their own customers.
You need a meter that records exports every half hour, which in practice means a smart meter.
Not for a home system: systems up to 50 kW need MCS or equivalent certification for both installer and installation.
No. The Feed-in Tariff closed to new systems in 2019. Existing Feed-in Tariff payments continue under their own terms.
Figures and rules on this page were checked on 11 October 2026. Schemes, tariffs and prices change, so check the latest before you decide.
Every home system we fit comes with an MCS certificate, so you can apply for an export tariff as soon as it arrives. We'll explain how.
Prefer to talk? Call 0333 577 6576, Monday to Friday, 9am to 5pm.
Get a quote and we'll help calculate how much you could save.
Google
reviews5.0
Rated 5 out of 5
by our customers on Google
We'll only use your details for your quote. Privacy policy